16.

A and B can complete a job alone in 18 and 27 working days. They work together throughout and split Rs. 7500 in proportion to the work each completes. What is A's share? Assume constant work rates.

Show answer
Explanation

1. Find the work ratio. Since both work for the same time, their contributions are proportional to their rates.

WA:WB=118:127=3:2W_A:W_B=\frac1{18}:\frac1{27}=3:2

2. Allocate three-fifths of the payment to A.

A’s share=33+2×7500=Rs. 4500\text{A's share}=\frac3{3+2}\times7500=\boxed{\text{Rs. }4500}

Answer: B = Rs. 4500.

17.

10 equally productive workers are scheduled to finish a job in 18 working days. After 6 days, 5 more equally productive workers join them. With unchanged daily hours, how many additional working days are needed? Assume constant work rates.

Show answer
Explanation

1. Calculate the remaining worker-days.

Total work=10×18=180Completed work=10×6=60Remaining work=180−60=120\begin{aligned} \text{Total work}&=10\times18=180\\ \text{Completed work}&=10\times6=60\\ \text{Remaining work}&=180-60=120 \end{aligned}

2. Divide by the enlarged team size.

tadditional=12010+5=8 dayst_{\text{additional}}=\frac{120}{10+5}=\boxed{8\text{ days}}

Answer: A = 8 days.

18.

12 equally productive workers could finish a job in 20 working days. After 5 working days, the deadline is brought forward to the end of working day 15. How many additional equally productive workers must join for the remaining days, with unchanged daily hours? Assume constant work rates.

Show answer
Explanation

1. Find the work remaining after five days.

Wleft=12(20−5)=180 worker-daysW_{\text{left}}=12(20-5)=180\text{ worker-days}

2. Find the team size needed for the ten days left before the new deadline.

Required workers=18015−5=18\text{Required workers}=\frac{180}{15-5}=18

3. Subtract the existing workers.

Additional workers=18−12=6\text{Additional workers}=18-12=\boxed{6}

Answer: D = 6 workers.

19.

On separate computers, Meera types 24 equally long pages in 3 hours and Dev types 30 in 5 hours. They divide a 70-page document between them and type simultaneously. How many hours will they need? Assume constant work rates.

Show answer
Explanation

1. Convert each typing output to pages per hour.

rM=243=8,rD=305=6r_M=\frac{24}{3}=8,\qquad r_D=\frac{30}{5}=6

2. Divide the document length by their combined rate.

t=708+6=5 hourst=\frac{70}{8+6}=\boxed{5\text{ hours}}

In five hours, Meera types 40 pages and Dev types 30.

Answer: B = 5 hours.

20.

A can complete a job in 10 days at 6 hours per day. B can complete it in 15 days at 4 hours per day. If they work together for 5 hours per day, how many working days are needed? Assume constant work rates.

Show answer
Explanation

1. Compare hourly rates rather than daily rates.

TA=10×6=60 h,TB=15×4=60 hT_A=10\times6=60\text{ h},\qquad T_B=15\times4=60\text{ h}

2. Find the joint working hours and convert to five-hour days.

r=160+160=130,Days=305=6r=\frac1{60}+\frac1{60}=\frac1{30},\qquad \text{Days}=\frac{30}{5}=\boxed{6}

Answer: C = 6 days.