Treat one complete job as 1 unit. Add work rates, then divide remaining work by the active rate.
- a
- Time for A; use the same time unit.
- b
- B alone to finish one job; use the same time unit.
- r
- Work rate; one complete job has W = 1.
- W
- work completed; one complete job has W = 1.
- T
- elapsed time; one complete job has W = 1.
Individual rate
Assume a constant rate for the same job.
Work completed
For changing teams, add the work from each stage.
Working together
Independent rates add.
One worker unknown
T is their combined completion time; require r_B > 0.
Efficiency and time
For the same job, time is inversely proportional to efficiency.
Workforce changes
Use only when productivity scales with workers and hours.
Explanations and worked examples
Open a method when you need more detail.
Full notation guide
- a
- Time for A; use the same time unit.
- b
- B alone to finish one job; use the same time unit.
- r
- Work rate; one complete job has W = 1.
- W
- work completed; one complete job has W = 1.
- T
- elapsed time; one complete job has W = 1.
- e_A
- Work rate of A.
- e_B
- Work rate of B.
- N
- Worker count.
- D
- days.
- H
- hours per day.
- e
- rate per worker-hour.
1. Use work per unit time
Finishing a job in a days means completing 1/a of it per day. Work equals rate times time; using fractions avoids confusing days with work.
Worked example
A worker finishes a job in 12 days. What fraction is completed in 5 days?
- Daily rate = 1/12 of the job.
- In 5 days, work = 5/12.
5/12 of the job.
Remember
- Constant rate is an assumption. Rates measured per hour cannot be added directly to rates measured per day.
2. Add independent work rates
For simultaneous workers doing the same divisible job, add their daily contributions. For any number of workers, total time is 1 divided by the sum of their rates.
Worked example
A can complete a job in 12 days and B in 18 days. How long together?
- Combined daily work = 1/12 + 1/18 = 5/36.
- Time = 1 ÷ (5/36) = 36/5 days.
7.2 working days.
Remember
- 7.2 working days is not automatically 7 days 4.8 hours: the working hours per day must be known.
3. Recover an individual worker’s rate
Subtract known rates from the combined rate, then take the reciprocal to recover the unknown time.
Worked example
A and B together finish in 8 days. A alone takes 12 days. Find B’s time alone.
- B’s rate = 1/8 − 1/12 = 1/24.
- B therefore needs 24 days.
24 days.
Remember
- A positive additional worker must make the combined time shorter than A’s time alone. A nonpositive recovered rate contradicts that setup.
4. Joining, leaving and remaining work
Break the schedule whenever the active team changes. Calculate the work completed in each finished stage, subtract from 1, then divide by the next team’s rate.
Worked example
A takes 12 days alone and B takes 18. They work together for 3 days; then A leaves. How much longer does B need?
- Completed = 3(1/12 + 1/18) = 5/12.
- Remaining = 7/12.
- B’s additional time = (7/12)/(1/18) = 10.5 days.
10.5 additional days; 13.5 days in total.
Remember
- Check whether the job has already finished before a scheduled departure. Do not keep accumulating work beyond completion.
5. Convert efficiency ratios into time ratios
If A produces 3 units while B produces 2 in the same time, their rate ratio is 3:2. For the same total job their time ratio is 2:3.
Worked example
A is 50% more efficient than B. B needs 18 days for a job. How long does A need?
- A’s rate is 1.5 times B’s rate.
- A’s time = 18/1.5 = 12 days.
12 days.
Remember
- 50% more efficient means 1.5 times the rate, not half the time.
6. Alternating workers: count cycles, then the last partial turn
For alternating days, calculate work in a full cycle, use complete cycles only while the job remains unfinished, then inspect each turn of the final cycle in order.
Worked example
A takes 10 days alone and B takes 15. They work on alternate days, A first. When does the job finish?
- Each two-day cycle completes 1/10 + 1/15 = 1/6.
- After 5 cycles (10 days), 1/6 remains.
- A completes 1/10 on day 11, leaving 1/15.
- B completes that on day 12.
At the end of day 12.
Remember
- Dividing by an averaged daily rate can give the wrong finishing time when the last turn is incomplete. Who starts matters.