A finishes 60% of a job in 12 working days. B then joins A, and they finish the remaining work in 4 working days. How long would B alone take for the whole job? Assume constant work rates.
Show answer
1. Find A's rate and the later combined rate.
Both rates are measured in jobs per working day.
2. Isolate B's rate and calculate B's solo time.
Answer: D = 20 days.