Time and Work

Practice problems involving work, efficiency, and time.

Formulas & shortcuts
6.

Three teams can complete a sorting job alone in 12, 24 and 24 working days. How long will they take if all three work together on separate portions? Assume constant work rates.

Show answer
Explanation

1. Add the three daily work rates.

r=112+124+124=2+1+124=16r=\frac1{12}+\frac1{24}+\frac1{24} =\frac{2+1+1}{24}=\frac16

2. Calculate the time for one job.

t=1r=6 dayst=\frac1r=\boxed{6\text{ days}}

Answer: C = 6 days.

7.

9 equally productive workers can complete a job in 20 working days. How many working days will 12 such workers need, with the same daily hours? Assume constant work rates.

Show answer
Explanation

1. Express the job in worker-days.

Work=9×20=180 worker-days\text{Work}=9\times20=180\text{ worker-days}

2. Share the work among 12 equally productive workers.

t=18012=15 dayst=\frac{180}{12}=\boxed{15\text{ days}}

The daily hours are unchanged, so worker-days are a consistent measure.

Answer: D = 15 days.

8.

A and B can each finish a job alone in 20 and 30 working days. They work together for 6 working days, after which B leaves. How many additional working days does A need? Assume constant work rates.

Show answer
Explanation

1. Find the work completed before B leaves.

W=6(120+130)=6×112=12W=6\left(\frac1{20}+\frac1{30}\right) =6\times\frac1{12}=\frac12

2. Divide the remaining half by A's daily rate.

tadditional=1/21/20=10 dayst_{\text{additional}}=\frac{1/2}{1/20}=\boxed{10\text{ days}}

The question asks for additional time, not the 16-day total.

Answer: B = 10 days.

9.

Team A needs 24 working days to complete a job alone; team B needs 12. A works alone for 6 working days, then B joins A until completion. What is the total number of working days from A's start? Assume constant work rates.

Show answer
Explanation

1. Find the work left when B joins.

Wleft=1−624=34W_{\text{left}}=1-\frac6{24}=\frac34

2. Calculate the joint time for this remainder.

r=124+112=18,tjoint=3/41/8=6 daysr=\frac1{24}+\frac1{12}=\frac18,\qquad t_{\text{joint}}=\frac{3/4}{1/8}=6\text{ days}

3. Include A's initial six days.

ttotal=6+6=12 dayst_{\text{total}}=6+6=\boxed{12\text{ days}}

Answer: A = 12 days.

10.

A can finish a job alone in 28 working days. A works for 7 working days, then B completes the rest in 14 working days. How many working days would A and B need together for the whole job? Assume constant work rates.

Show answer
Explanation

1. Infer B's daily rate from the remaining work.

Wleft=1−728=34,rB=3/414=356W_{\text{left}}=1-\frac7{28}=\frac34,\qquad r_B=\frac{3/4}{14}=\frac3{56}

2. Add A's rate and invert.

rA+rB=128+356=556r_A+r_B=\frac1{28}+\frac3{56}=\frac5{56} t=565=11.2 dayst=\frac{56}{5}=\boxed{11.2\text{ days}}

Answer: A = 11.2 days.