Chain Rule

Formulas & shortcuts
6.

Two gears with 24 and 40 teeth mesh without slipping. If the 24-tooth gear makes 150 revolutions, how many revolutions does the 40-tooth gear make?

Show answer
Explanation

1. Equate the number of teeth passing the contact point. Each revolution of the smaller gear moves 24 teeth past that point.

24×150=40n24\times150=40n

2. Solve for the larger gear's revolutions.

n=24×15040=90n=\frac{24\times150}{40}=\boxed{90}

More teeth per revolution means fewer revolutions.

Answer: A = 90 revolutions.

7.

At the same time on level ground, a vertical 2 m pole casts a 3 m shadow. A nearby vertical tree casts a 12 m shadow. What is the tree's height?

Show answer
Explanation

1. Use the common height-to-shadow ratio. The same sunlight angle produces similar triangles.

Tree height12=23\frac{\text{Tree height}}{12}=\frac23

2. Solve for the height.

Tree height=12×23=8 m\text{Tree height}=12\times\frac23=\boxed{8\text{ m}}

Answer: B = 8 m.

8.

Four identical machines produce 480 components in 3 hours. At unchanged constant rates, how many components will 6 such machines produce in 5 hours?

Show answer
Explanation

1. Find output per machine-hour.

r=4804×3=40 componentsr=\frac{480}{4\times3}=40\text{ components}

2. Multiply by the new machine-hours.

Q=40×6×5=1200 componentsQ=40\times6\times5=\boxed{1200\text{ components}}

Answer: C = 1200 components.

9.

16 equally productive workers complete a job in 15 days at 6 hours per day. How many days will 12 such workers need at 8 hours per day?

Show answer
Explanation

1. Express the fixed job in worker-hours.

W=16×15×6=1440W=16\times15\times6=1440

2. Divide by the new daily capacity.

t=144012×8=15 dayst=\frac{1440}{12\times8}=\boxed{15\text{ days}}

The smaller team works longer days, leaving daily worker-hours unchanged.

Answer: D = 15 days.

10.

Three identical pumps empty a reservoir in 4 days, operating 6 hours per day. How many hours per day must 4 such pumps operate to empty an equally full reservoir in 3 days? Assume constant pumping rates.

Show answer
Explanation

1. Calculate the required pump-hours.

W=3×4×6=72 pump-hoursW=3\times4\times6=72\text{ pump-hours}

2. Spread this over four pumps for three days.

Hours per day=724×3=6\text{Hours per day}=\frac{72}{4\times3}=\boxed{6}

Answer: B = 6 hours.