Data Table 6

Answer questions using the figures in a shared data table.

Output and quality checks on four production lines

Directions: Study the table and answer the questions below.

All lines manufacture the same component. Hours worked are per worker for one shift; every worker on a line works the stated hours. Rejected units are included in total units produced. Accepted units = produced − rejected. No rejected units are reworked during the shift.

Output and quality checks on four production lines
LineWorkersHours per workerUnits producedUnits rejected
A127126060
B108128040
C156144090
D8896064
1.

How many accepted units did Line C produce?

Show answer
Explanation

Line C produced 1,440 units, including 90 rejected units. Accepted output = 1,440 − 90 = 1,350.

2.

Which line produced the most accepted units per worker-hour?

Show answer
Explanation

Accepted units per worker-hour are A: 1,200/(12 × 7) ≈ 14.29; B: 1,240/(10 × 8) = 15.50; C: 1,350/(15 × 6) = 15; D: 896/(8 × 8) = 14. Line B is highest.

3.

What percentage of all units produced were rejected? Round to two decimal places.

Show answer
Explanation

Rejected units total 60 + 40 + 90 + 64 = 254. Production totals 1,260 + 1,280 + 1,440 + 960 = 4,940. The overall rejection rate is 254/4,940 × 100 = 5.14%.

4.

Line B adds two workers, each working 8 hours. If accepted output remains proportional to worker-hours at Line B’s current rate, how many additional accepted units will it produce?

Show answer
Explanation

Line B’s current accepted output per worker-hour is (1,280 − 40)/(10 × 8) = 15.5. Two extra workers provide 16 worker-hours, giving 16 × 15.5 = 248 additional accepted units under the stated proportionality assumption.

5.

A quality bonus of Rs. 2 per accepted unit is paid only to lines whose rejection rate is at most 5% of units produced. What is the total bonus for this shift?

Show answer
Explanation

Rejection rates are A: 60/1,260 ≈ 4.76%, B: 40/1,280 = 3.125%, C: 90/1,440 = 6.25%, D: 64/960 ≈ 6.67%. Only A and B qualify. Their accepted units total 1,200 + 1,240 = 2,440, so the bonus is 2 × 2,440 = Rs. 4,880.